<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dcterms="http://purl.org/dc/terms/">
<rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6599">
    <dcterms:title><![CDATA[Take a New Look at Westinghouse Combustion Turbines]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Combustion Turbines]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[In April of 1987, the Combustion Turbine Systems Division of Westinghouse Electric Corporation was relocated from its prior headquarters in Concordville, Pennsylvania to the World Headquarters of Westinghouse Power Generation located at The Quadrangle, on Alafaya Trail, across from the University of Central in Orlando, Florida. This brochure was prepared shortly after the move, first, as an internal communications document, and then reprinted for general distribution. It features an interview with Augie Scalzo, a long-time gas turbine engineer and engineering manager. After the move to Orlando, Scalzo was named Technical Director of Combustion Turbine Operations.<br /><br />Scalzo started his career with Westinghouse's Aviation Gas Turbine Division in Kansas City, Kansas, in 1953 and then moved to the Small Steam &amp; Gas Turbine Division headquarters in Lester, Pennsylvania, where he continued his work on industrial and power generation gas turbines. Around 1970, he was appointed Manager of Gas Turbine Engine Engineering, and was generally considered to be the "Father of the W501." This highly successful family of large power generating gas turbines, introduced at around 40MW in 1968, is still the basis of the design of large gas turbines rated at upwards of 300MW.]]></dcterms:description>
    <dcterms:creator><![CDATA[<em>Energy Digest</em>]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 7-page brochure, July 1987: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[1987-07]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1987-07]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 7-page brochure, July 1987.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[15.5 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[7-page brochure]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by <em>Energy Digest</em>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6598">
    <dcterms:title><![CDATA[Combustion Turbine Cogeneration]]></dcterms:title>
    <dcterms:alternative><![CDATA[Combustion Turbine Cogeneration]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[This item is a brochure produced by Westinghouse Combustion Turbine Systems Division in Concordville, Pennsylvania, to describe the application of the 50MW model W251B10 and 100MW W501D5 combustion turbines (a.k.a. gas turbines) for use in cogeneration plants. Such plants were built for the simultaneous production of both electric energy and useful thermal energy for industrial process use. In the early 1980s, cogeneration became very popular among independent (non-utility) power generators (or Independent Power Producers, IPPs) since it enabled the owner to obtain an exemption from the Fuel Use Act, which, as part of the broad National Energy Act of 1978, specifically prohibited the base load (i.e. continuous year-'round) production of electricity using oil or natural gas fuels. Cogeneration plants were exempt from the Fuel Use Act due to their high efficiency compared to power-only generating plants. Also, owners of cogeneration plants were allowed to sell the electricity that they produced to the local electric utility company under another part of the National Energy Act, namely, the Public Utility Regulatory Policies Act, popularly known as "PURPA." the brochure provides data on the power and efficiency (heat rate) of the W251B10 and W501D5 gas turbines, as well data on the steam production capability by each via use of heat recovery boilers or steam generators.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 23-page brochure: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[1983]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1983]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 23-page brochure.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[2.91 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[23-page brochure]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Combustion Turbine Systems Division, Westinghouse Electric Corporation, Concordville, Pennsylvania]]></dcterms:coverage>
    <dcterms:coverage><![CDATA[ Turbine and Generator Division, Westinghouse Canada, Inc., Hamilton, Ontario, Canada]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6597">
    <dcterms:title><![CDATA[Steam-Cooled 501G Rated 230 MW with 2600°F Rotor Inlet Temperature]]></dcterms:title>
    <dcterms:alternative><![CDATA[Steam-Cooled 501G Rated 230 MW with 2600°F Rotor Inlet Temperature]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[The item is a copy of a reprinted article from the <em>Gas Turbine World</em> magazine issue for November-December of 1994. The subject of the article is the Westinghouse-Mitsubishi 501G gas turbine that had been introduced at the American Society of Mechanical Engineers (ASME) International Gas Turbine Conference earlier that year. The 501G was a new gas turbine engine design featuring the results of a joint design effort of Westinghouse Power Generation and Mitsubishi Heavy Industries (MHI) of Japan. Other input to the design was provided by other members of a multi-national alliance, which included FiatAvio of Italy and Rolls-Royce of the United Kingdom. The 501G was touted as the "largest and most efficient" gas turbine in the world. Introductory simple-cycle power rating was 230MW and simple-cycle efficiency was 38.5 percent (8,860 Btu/kWh, gas, LHV, ISO conditions). The combined cycle performance being quoted at the time was 345MW with a heat rate of 5,883 Btu/kWh (58% efficiency). The 501G was last of the long line of Westinghouse gas turbines before the company was acquired by Siemens AG of Germany in 1998. The first 501G was built at Westinghouse's factory in Hamilton, Ontario, Canada, and installed at the McIntosh Station in Lakeland, Florida, in 1998.]]></dcterms:description>
    <dcterms:creator><![CDATA[Farmer, Robert]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 8-page magazine article: Farmer, Robert. "Steam-Cooled 501G Rated 230 MW with 2600°F Rotor Inlet Temperature." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 24, No. 6, November-December 1994: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1994-11]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1994-12]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[ca. 1994-12]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 8-page magazine article: Farmer, Robert. "Steam-Cooled 501G Rated 230 MW with 2600°F Rotor Inlet Temperature." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 24, No. 6, November-December 1994.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[5.98 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[8-page magazine article]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by Robert Farmer and published by <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6596">
    <dcterms:title><![CDATA[Westinghouse W501D Combustion Turbine: Guide to Systems and Applications]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse W501D Combustion Turbine]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[This manual was produced to provide customers with a useful source of information about the Westinghouse W501D5 100MW combustion turbine (a.k.a. gas turbine) power-generating unit. The information describes the various subsystems comprising the packaged power generating unit (called the Westinghouse ECONOPAC') and also provides all of the performance data and correction curves for application of the W501D5 to customer's specific projects. The W501D5 was an improved version of the prior W501D design, introduced in 1980.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 28-page manual, 1983: Item SA 11321-A, Westinghouse Electric Corporation Archives.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1983]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1983]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 28-page manual, 1983.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[Westinghouse Electric Corporation Archives.]]></dcterms:isPartOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[13.3 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[28-page manual]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Combustion Turbine Systems Division, Westinghouse Electric Corporation, Concordville, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6595">
    <dcterms:title><![CDATA[Westinghouse Electric Corporation Steam Turbine-Generator Division World Headquarters Building Dedication, November 6, 1983]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Steam Turbine-Generator Division Building Dedication]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A booklet for the building dedication ceremony of Westinghouse Electric Corporation's Steam Turbine-Generator Division World Headquarters on November 6, 1983. As the decade of the 1970s was coming to a close, Westinghouse decided to consolidate and relocate the headquarters functions for Steam Turbines and Electric Generators to Orlando, Florida, on property they purchased across the street from the University of Central Florida. They had been located with their respective manufacturing locations at opposite ends of Pennsylvania for over 60 years: Generators in East Pittsburgh, and Steam Turbines in Lester, just outside of Philadelphia. In June of 1980, a small startup team arrived in Orlando, and by the late summer of 1983, the new headquarters building had been designed and constructed, and was ready for occupancy. On November 6, 1983, this booklet was distributed as part of a dedication ceremony. It also describes the many new features of the building, which was designed to facilitate teamwork, improve communication internally and with customers, utilize the latest designs in modular office furniture and information systems technology, and be a showcase for customers and potential customers.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 16-page booklet: Private Collection of Ned Kessler.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1983-10]]></dcterms:created>
    <dcterms:issued><![CDATA[ca. 1983-11-06]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Kessler, Ned]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 16-page booklet.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[2.11 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[16-page booklet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Geography Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6594">
    <dcterms:title><![CDATA[Evolution of Heavy-Duty Power Generation and Industrial Combustion Turbines in the United States]]></dcterms:title>
    <dcterms:alternative><![CDATA[Heavy-Duty Power Generation and Industrial Combustion Turbines]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[A paper published in 1994 by the American Society of Mechanical Engineers (ASME). Written by A. J. Scalzo, R. L. Bannister, M. DeCorso, and G. S. Howard, this paper provides a concise compilation of the history of Westinghouse Electric's combustion turbine technology, from its origins in the early development of a U.S.-built aviation gas turbine for jet propulsion during World War II, through the early industrial applications starting in 1948, and continuing through decades of evolution of the heavy duty power generation machines up to and including the advanced 160MW W501F.]]></dcterms:description>
    <dcterms:creator><![CDATA[Scalzo, A. J.]]></dcterms:creator>
    <dcterms:creator><![CDATA[ Bannister, R. L.]]></dcterms:creator>
    <dcterms:creator><![CDATA[ DeCorsO, M.]]></dcterms:creator>
    <dcterms:creator><![CDATA[ Howard, G. S.]]></dcterms:creator>
    <dcterms:source><![CDATA[Reprinted 19-page academic paper: Scalzo, A. J., R. L. Bannister, M. DeCorso, and G. S. Howard. 1994. "Evolution of Heavy-Duty Power Generation and Industrial Combustion Turbines in the United States." <em>Proceedings of the ASME Turbo Expo</em>: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="https://www.asme.org/" target="_blank">American Society of Mechanical Engineers</a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[1994]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1994]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of reprinted 19-page academic paper: Scalzo, A. J., R. L. Bannister, M. DeCorso, and G. S. Howard. 1994. "Evolution of Heavy-Duty Power Generation and Industrial Combustion Turbines in the United States." <em>Proceedings of the ASME Turbo Expo</em>.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[6.01 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[19-page academic paper]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by A. J. Scalzo, R. L. Bannister, M. DeCorso, and G. S. Howard published by the <a href="https://www.asme.org/" target="_blank">American Society of Mechanical Engineers</a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by the <a href="https://www.asme.org/" target="_blank">American Society of Mechanical Engineers</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6593">
    <dcterms:title><![CDATA[PACE: The Westinghouse Combine Cycle Packaged Powerplant]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Combine Cycle Packaged Powerplant]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A brochure about Westinghouse Electric's Power At Combined Efficiencies (PACE) system for intermediate-load power plants. In 1970, the Westinghouse Electric Corporation's Gas Turbine Systems Division, located in Lester and Eddystone, Pennsylvania, introduced its pioneering concept for a pre-engineered packaged combined-cycle power plant comprised of two W-501 gas turbines, two heat recovery boilers (or heat recovery steam generators), and one 100MW steam turbine. The first PACE plant was called PACE 260, based on the nominal power rating (260MW) of the plant. The gas turbine model was then designated the W-501B, with a nominal rating of 75MW. Later, in the mid-1970s, with the advent of the first 100MW-class W-501D, the PACE plant rating was increased to approximately 320MW, without the use of any supplemental firing of the HRSGs, as was the case with the PACE 260. This brochure was for the PACE 320 and is the second such PACE brochure. The first was published around 1971 for the PACE 260.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 12-page brochure: <em>PACE: The Westinghouse Combine Cycle Packaged Powerplant</em> (Philadelphia: Westinghouse Electric Corporation Gas Turbine Systems Division): Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1975]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1975]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Jarry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 12-page brochure: <em>PACE: The Westinghouse Combine Cycle Packaged Powerplant</em> (Philadelphia: Westinghouse Electric Corporation Gas Turbine Systems Division).]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[1.36 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[12-page brochure]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Gas Turbine Systems division, Philadelphia, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6592">
    <dcterms:title><![CDATA[Westinghouse Combustion Turbines: The Ready Source of Power...Worldwide]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Combustion Turbines]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A brochure about Westinghouse Electric's combustion turbine systems. In 1980, Westinghouse's Combustion Turbine Systems Division (CTSD) embarked on a major advertising campaign to introduce its newly upgraded main product: the 100MW W501D5 gas turbine. This brochure was part of the marketing communications that was launched program at that time.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 32-page brochure: <em>Westinghouse Combustion Turbines: The Ready Source of Power...Worldwide</em> (Concordville, PA: Westinghouse Combustion Turbine Systems Division): Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1980-1981]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1980-1981]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Jaeger, Jarry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 32-page brochure: <em>Westinghouse Combustion Turbines: The Ready Source of Power...Worldwide</em> (Concordville, PA: Westinghouse Combustion Turbine Systems Division).]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[3.81 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[32-page brochure]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Combustion Turbine Systems Division, Westinghouse Electric Corporation, Concordville, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6591">
    <dcterms:title><![CDATA[Orlando Centennial Scrapbook: Westinghouse Centennial, 1886-1986]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Centennial]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse, George, 1846-1914]]></dcterms:subject>
    <dcterms:description><![CDATA[In commemoration of the 100-year anniversary of the Westinghouse Electric Corporation, this booklet was created to tell the highlights of the contribution of George Westinghouse (1846-1914) , identify the many connected families in the employee ranks, and to report on the celebration that marked the event and progress of the organization.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 10-page booklet: Scalise, Jan, ed. <em>Orlando Centennial Scrapbook: Westinghouse Centennial, 1886-1986</em> (Orlando: Human Resources Communications, Westinghouse Orlando, 1986): Private Collection of George E. Baker.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1986]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1986]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Scalise, Jan]]></dcterms:contributor>
    <dcterms:contributor><![CDATA[Baker, George E.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 10-page booklet: Scalise, Jan, ed. <em>Orlando Centennial Scrapbook: Westinghouse Centennial, 1886-1986</em> (Orlando: Human Resources Communications, Westinghouse Orlando, 1986).]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[3.06 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[10-page booklet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Pittsburgh, Pennsylvania]]></dcterms:coverage>
    <dcterms:coverage><![CDATA[ Westinghouse Power Generation Business Unit, Orlando, Florida<br />
<br />
]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally edited by Jan Scalise and published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric Corporation and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6589">
    <dcterms:title><![CDATA[Westinghouse Song Sheet Music]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Song]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[Sheet music for "Westinghouse Song," composed by Schulter C. Morgan in 1939. During the 1930s, the Westinghouse Electric and Manufacturing Company held a contest for the composition of the company's official song. The composer, Schulter C. Morgan, won the contest.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945.]]></dcterms:description>
    <dcterms:creator><![CDATA[Morgan, Schulter C.]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 4-page sheet music: Morgan, Schulter C. "Westinghouse Song." Westinghouse Electric and Manufacturing Company, 1939: Private Collection of George E. Baker.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric and Manufacturing Company]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1939]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1939]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Baker, George E.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 4-page sheet music: Morgan, Schulter C. "Westinghouse Song." Westinghouse Electric and Manufacturing Company, 1939.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[1.13 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[4-page sheet music]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric and Manufacturing Company, Gateway Center, Pittsburgh, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Humanities Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Music Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by Schulter C. Morgan and published by Westinghouse Electric and Manufacturing Company.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Westinghouse Electric and Manufacturing Company and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6527">
    <dcterms:title><![CDATA[Electric Utility Supplies On-Site Power]]></dcterms:title>
    <dcterms:alternative><![CDATA[Electric Utility Supplies On-Site Power]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Southern California Edison Company]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Printing--United States]]></dcterms:subject>
    <dcterms:description><![CDATA[A reprint of an article by George E. Baker published <em>POWER</em> magazine in December of 1969. In 1967, the Southern California Edison Company (SCE) partnered with the Garden State Paper Company (GSP) to install and operate an on-site gas-turbine generator and heat recovery system to supply all the energy needs of a patented de-inking process to produce clean newsprint from used newspapers. This unique co-generation system provided the operating flexibility, operating economics, site compatibility, and reliability to make it the ideal solution for both partners. SCE supplied both electricity and heat energy while GSP enjoyed the advantage of low cost, reliable energy right at the process plant. Westinghouse Electric supplied the W-191 pre-packaged gas turbine that was electrically tied to the SCE grid. Voigt supplied the fired heat recovery boiler with a standby forced draft fan for backup duty. The plant went commercial in January of 1967.]]></dcterms:description>
    <dcterms:creator><![CDATA[Baker, George E.]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 5-page magazine article: Baker, George E. <a href="http://www.powermag.com/" target="_blank"><em>POWER</em></a>, December 1969: Private Collection of George E. Baker.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="http://www.powermag.com/" target="_blank"><em>POWER</em></a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[1969-12]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1969-12]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[1969-12]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Baker, George E.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 5-page magazine article: Baker, George E. <a href="http://www.powermag.com/" target="_blank"><em>POWER</em></a>, December 1969.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[2.27 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[5-page magazine article ]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Garden State Paper Company Paper Mill, Pomona, California]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by George E. Baker and published by <a href="http://www.powermag.com/" target="_blank"><em>POWER</em></a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="http://www.powermag.com/" target="_blank"><em>POWER</em></a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6526">
    <dcterms:title><![CDATA[Westinghouse Tampa Division]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Tampa Division]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Tampa (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[Westinghouse Electric's nuclear steam generator and pressurizer factory located at 6501 South West Shore Boulevard in Tampa, Florida. The product lines of nuclear steam generators and pressurizers were moved to Tampa from the Power Generation Heat Transfer Division and manufacturing plant in Lester, Pennsylvania, just outside of Philadelphia. The Westinghouse Tampa Division, which went operational in 1968, was located on a 42-acre swampy piece of land on Tampa Bay, in an area then known as Rattlesnake Flats.<br /><br />The Tampa manufacturing facility was somewhat of an economic boom to the area. At the time of the announcement made by John T. Steifel, General Manager of the Westinghouse Heat Transfer Division, in May 1967, it was expected to have a $5,000,000 annual payroll. The workforce consisted of personnel who moved to Tampa from the Lester plant, but was primarily staffed with hires from the local area. The plant employed hundreds of people, consisting of design engineers, information technology (IT) personnel, manufacturing engineers, fabricators, welders, quality assurance engineers, inspectors, and members of many other disciplines. The clean, "smokeless," $25-million plant consisted of nearly 300,000 square feet (which was nearly doubled after an expansion) of high technology, automated, heavy manufacturing, testing, and inspection equipment, as well as a steam generation test facility.<br /><br />During its operation, the plant manufactured and shipped major nuclear plant components to many U.S. and international power plants. The products manufactured at this Tampa-based plant provide people with electricity throughout the United States and in Japan, Spain, Switzerland, France, South Korea, and other countries around the world. In those early days in the nuclear power generation industry, before the creation of a dedicated a Nuclear Service Division, much of the service work on the nuclear components was done by the personal at the manufacturing plants going to the field.<br /><br />Due to the nuclear plant accidents at Three Mile Island in 1979 and at Chernobyl in 1986, as well as the increasing costs due to lawsuits aimed at shutting down the nuclear power business, many nuclear plant orders dried up and the Westinghouse Tampa plant was closed as a manufacturing facility in the early 1980s. More than a few of the engineering and other professional personnel relocated to the Westinghouse Power Generation Business Unit in Orlando.<br /><br />For a few years after the plant closure, George Steinbrenner’s (1930-2010) American Ship Building Company leased the manufacturing facility for the modification and fabrication of large ocean going vessels. Also during that time, the Westinghouse Southeastern Nuclear Technology Center's engineering office, managed by Pete DeRosa, was located at the facility. It provided analytic support to Westinghouse nuclear plants under construction. Today, where the Tampa plant once stood on Tampa Bay are now townhouses and a high-rise condominium.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 5 x 7 inch color photograph, 1968: Private Collection of Pete DeRosa.]]></dcterms:source>
    <dcterms:created><![CDATA[1968]]></dcterms:created>
    <dcterms:contributor><![CDATA[DeRosa, Pete]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 5 x 7 inch color photograph, 1968.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[223 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[5 x 7 inch color photograph]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Tampa Division, Tampa, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Geography Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally owned by Pete DeRosa.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6514">
    <dcterms:title><![CDATA[150 MW Class 501F Design to Begin Full Load Factory Testing This Summer]]></dcterms:title>
    <dcterms:alternative><![CDATA[150 MW Class 501F Design to Begin Full Load Factory Testing]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[This article was published by the <em>Gas Turbine World</em> magazine in the May-June 1989 issue. It reports on the status of the new Westinghouse 501F advanced gas turbine that was jointly developed with Mitsubishi Heavy Industries (MHI). At the time, the prototype or first-build was being completed at the MHI factory in Japan. The 150MW-class 501F was the first new gas turbine design to be offered by Westinghouse Electric Corporation following the move of the Combustion Turbine Operations department of the Power Generation Business Unit (PGBU) to Orlando, Florida, in 1987.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:creator><![CDATA[Farmer, Robert]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 7-page magazine article: Farmer, Robert. "150 MW Class 501F Design to Begin Full Load Factory Testing This Summer." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 19, No. 3, May-June 1989: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1989-05]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1989-06]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[ca. 1989-06]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 7-page magazine article: Farmer, Robert. "150 MW Class 501F Design to Begin Full Load Factory Testing This Summer." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 19, No. 3, May-June 1989.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[20.8 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[7-page magazine article]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by Robert Farmer and published by <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by Gas Turbine World and is provided here by RICHES of Central Florida for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6497">
    <dcterms:title><![CDATA[Power Systems Business Unit]]></dcterms:title>
    <dcterms:alternative><![CDATA[Power Systems Business Unit]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[This brochure was published around mid-1986 to announce a major restructuring of Westinghouse Electric&#039;s Power Systems Business Unit (PSBU). Until that time, the unit was composed of two separate business units: Nuclear Energy Systems, headquartered in Monroeville, Pennsylvania, and Power Generation, headquartered in Pittsburgh and in Orlando, Florida. At the time, Power Generation factories were located in Charlotte and Winston Salem, North Carolina, and in East Pittsburgh. The reorganization announced in this brochure brings the Nuclear and Power Generation operations under one sub-corporate organization, the Power Systems Business Unit, which was to be managed by Jim Moore, Vice President and General Manager, reporting to Executive Vice President Theodore Stern. Directly affecting the Orlando operation was the naming of Tom Campbell as General Manager of Generation Technology Systems Division. Campbell transferred to Orlando, where he became site manager for the next two years.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 14-page brochure, 1986: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[1986]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 14-page brochure, 1986.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[18.5 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[14-page brochure]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Economics Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6441">
    <dcterms:title><![CDATA[Westinghouse W-501D 100 MW Single Shaft Heavy Duty Combustion Turbine]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse W-501D Combustion Turbine]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[In 1980, Westinghouse Electric introduced a redesigned and uprated model W501D combustion (gas) turbine nominally rated at 100MW. This document is a reprint of an article published in the <em>International Power Generation</em> magazine in the United Kingdom in time for distribution at the 1981 American Society of Mechanical Engineers (ASME) Gas Turbine Conference and Expo in London. The W501D introduced at that time was later called the W501D5 and, after initial sales and field testing, was offered at a rating of approximately 105MW.<br /><br />The article describes the many new design features that represented significant upgrades and improvements over the previous version of the W501D. It also describes the various applications of the gas turbine including simple cycle "EconoPac," combined cycle and operation with alternative fuels such as gasified coal. The W501D5 was the largest and most efficient heavy duty 60Hz (3600RPM) gas turbine in the world at the time.]]></dcterms:description>
    <dcterms:creator><![CDATA[Scalzo, A. J.]]></dcterms:creator>
    <dcterms:creator><![CDATA[Howard, G. S.]]></dcterms:creator>
    <dcterms:creator><![CDATA[Holden, P. C.]]></dcterms:creator>
    <dcterms:creator><![CDATA[Morrash, J.]]></dcterms:creator>
    <dcterms:source><![CDATA[Reprinted magazine article: Scalzo, A. J., G. S. Howard, P.C. Holden, and J. Morrash. "Westinghouse W-501D 100 MW Single Shaft Heavy Duty Combustion Turbine." <a href="http://www.worldcat.org/oclc/44871430" target="_blank"><em>International Power Generation</em></a>, October 1980: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="http://www.worldcat.org/oclc/44871430" target="_blank"><em>International Power Generation</em></a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1980-10]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1980-10]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[1980-10]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of reprinted magazine article: Scalzo, A. J., G. S. Howard, P.C. Holden, and J. Morrash. "Westinghouse W-501D 100 MW Single Shaft Heavy Duty Combustion Turbine." <a href="http://www.worldcat.org/oclc/44871430" target="_blank"><em>International Power Generation</em></a>, October 1980.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[1.78 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[8-page magazine article]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by the <a href="http://www.worldcat.org/oclc/44871430" target="_blank"><em>International Power Generation</em></a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource his held by the <a href="http://www.worldcat.org/oclc/44871430" target="_blank"><em>International Power Generation</em></a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6440">
    <dcterms:title><![CDATA[Alligator at the Hines Energy Complex]]></dcterms:title>
    <dcterms:alternative><![CDATA[Alligator at Hines Energy Complex]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Bartow (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[Alligators--Florida]]></dcterms:subject>
    <dcterms:description><![CDATA[An alligator at Block 1 of the Hines Energy Complex near Bartow, Florida, around 2000. Located at 7700 County Road 555 South in Bartow, this Progress Energy Florida, Inc. power plant opened in 1999 and was sold to Duke Energy in 2013. Westinghouse Electric supplied and installed the two gas-turbine generators and supporting auxiliary equipment for Block 1 at the plant. Hines had a cooling pond that happened to be a site of frequent alligator sightings. Alligators were able to scale the surrounding chain link fence by using the leverage of their large tails to boost them up and over. As a result, plant operators made their rounds in trucks with extra caution.]]></dcterms:description>
    <dcterms:source><![CDATA[Original color photograph: Private Collection of George E. Baker.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 2000]]></dcterms:created>
    <dcterms:contributor><![CDATA[Baker, George E.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original color photograph.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[266 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 color photograph]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Hines Energy Complex, Bartow, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Geography Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally owned by George E. Baker.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6437">
    <dcterms:title><![CDATA[Early Westinghouse Gas Turbine Power Generating Unit]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Gas Turbine Power Generating Unit]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[This photograph shows the installation of the first Westinghouse 40MW model W501A gas turbine, located at the Dow Chemical Company's on-site power generation facilities in Freeport, Texas. Dow was a major customer of Westinghouse gas turbine generators and was a pioneer in application of gas turbines for industrial on-site power generation, combined with exhaust heat recovery for production of process steam or additional power. Dow’s first gas turbine, also installed in this way at the facility in Freeport, was a Westinghouse 30MW model W301, which started operation in 1965. In all, Dow installed some 20 Westinghouse gas turbines in Texas and at their site in Plaquemine, Louisiana. Today, this combined heat and power (CHP) application of gas turbines is commonplace and is also known as gas turbine cogeneration.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 33mm slide: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1968]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 33mm slide.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[104 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[33mm slide]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Dow Chemical Plant, Freeport, Texas]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Geography Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally owned by Harry Jaeger.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6436">
    <dcterms:title><![CDATA[Westinghouse Power Generation Systems Organization Chart, 1995]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Power Generation Systems Organization]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[Corporations--Florida]]></dcterms:subject>
    <dcterms:description><![CDATA[This organization chart, shows the upper management structure of the Generation Systems Division for the Westinghouse Electric Corporation's Power Generation Business Unit (PGBU), effective January of 1995. The chart shows the organization under General Manager Randy H. Zwirn, who joined Westinghouse in 1976. In January of 1996, Zwirn was elected at Corporate Officer for the company. Shortly after this organization chart was published, Zwirn was named Executive Vice President and Chief Operating Officer of the Westinghouse Power Generation Business Unit. As the Chief Executive Officer (CEO) of PGBU, Zwirn followed Frank Bakos, who retired in late 1994. Zwirn left Westinghouse in 1998 to join Siemens AG, an engineering company based in Germany. As of December of 2015, Zwirn serves as the President and Chief Executive Officer (CEO) of Siemens Energy Services, Inc. and CEO of the Energy Services Division in Orlando, Florida, with overall responsibilities for Siemens Energy activities in the Americas. Following the Siemens acquisition, the site organization became known as Siemens Westinghouse and then Siemens in 2003. Zwirn has remained in place at the top organizational position at the Orlando site since the acquisition.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original chart: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1994]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original chart.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[208 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 chart]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Power Generation Business Unit, Westinghouse Generation Systems Division, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Economics Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally owned by Harry Jaeger.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6189">
    <dcterms:title><![CDATA[The Generation Gap, Special Edition]]></dcterms:title>
    <dcterms:alternative><![CDATA[Generation Gap]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[An article published in <em>The Generation Gap</em>, Westinghouse Electric Corporation's newsletter, regarding the relocation of the company's Steam Turbine-Generator Division (STGD) from Lester and Pittsburgh, Pennsylvania to Orlando, Florida, starting in 1982. A new headquarters building was being constructed at The Quadrangle, at the corner of Alafaya Trail and University Boulevard. Temporary office space was located in a renovated shopping center on East Colonial Drive. Shown in photographs on the second page are executives uncovering the cornerstone of the new building (dated February of 1982), but the building was not ready to have it installed as yet.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. The company relocated its Steam Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida, beginning in 1981. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought CBS network. It then changed its name to the CBS Corporation.]]></dcterms:description>
    <dcterms:creator><![CDATA[Westinghouse Communications Department (for Power Generation Marketing Dept.)]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 4-page article: <em>The Generation Gap</em>, Spring 1982: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<em>The Generation Gap</em>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1982-03]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1982-03]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[ca. 1982-03]]></dcterms:issued>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 4-page article: <em>The Generation Gap</em>, Spring 1982.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="https://get.adobe.com/reader/" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[837 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[4-page article]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Power Generation Business Unit, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by <em>The Generation Gap</em>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <em>The Generation Gap</em> and is provided here by RICHES of Central Florida for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6188">
    <dcterms:title><![CDATA[We Heart Orlando Bumper Sticker]]></dcterms:title>
    <dcterms:alternative><![CDATA[We Heart Orlando]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[In April of 1987, the Combustion Turbine Systems Division of Westinghouse Electric Corporation was relocated from its prior headquarters in Concordville, Pennsylvania to the World Headquarters of Westinghouse Power Generation located at The Quadrangle, on Alafaya Trail, across from the University of Central in Orlando, Florida. This advertisement was prepared shortly after the move.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original color bumper sticker.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1982]]></dcterms:created>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original color bumper sticker.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[39.4 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 color bumper sticker]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Physical Object]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Power Generation Business Unit, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6187">
    <dcterms:title><![CDATA[Westinghouse Power Generation Booklet]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Power Generation]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A commemorative booklet published in 1993 or 1994 by Westinghouse's Power Generation Business Unit (PGBU) in Orlando, Florida, to celebrate 100 years of "Westinghouse Power Generation."  The booklet tells the history from the founding of the business by George Westinghouse (1846-1914) and its continuing progress through 100 years of service to the electric utility industry and other industrial customers worldwide. The booklet also describes the products and services, technology and manufacturing capabilities of the Power Generation Business Unit of the early 1990s.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 32-page booklet, 1993.]]></dcterms:source>
    <dcterms:created><![CDATA[1993]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1993]]></dcterms:dateCopyrighted>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 32-page booklet, 1993.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="https://get.adobe.com/reader/" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[5.02 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[32-page booklet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Company, Turtle Creek, Pittsburgh, Pennsylvania]]></dcterms:coverage>
    <dcterms:coverage><![CDATA[Westinghouse Power Generation Business Unit, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6185">
    <dcterms:title><![CDATA[Westinghouse Electric Corporation Model W21 Industrial Gas Turbine]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Model W21 Industrial Gas Turbine]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[Turbines]]></dcterms:subject>
    <dcterms:description><![CDATA[The first Westinghouse industrial gas turbine installation. It was installed by Mississippi River Fuel Corporation at Wilmar, Arkansas, and started operation in March of 1949. The turbine was used for a mechanical drive application (possibly a fuel-gas compressor) and rated at approximately 1800 hp (1340 kW). The turbine had dual-fuel capability, meaning that it could burn with distillate oil or natural gas. The unit ran in continuous service for many years before being retired later in the 20th century. There were also four other W21 units installed during the 1950s.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. The company relocated its Steam Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida, beginning in 1981. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought CBS network. It then changed its name to the CBS Corporation.]]></dcterms:description>
    <dcterms:source><![CDATA[Original color photograph.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1948-1949]]></dcterms:created>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original color photograph.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[119 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 color photograph]]></dcterms:medium>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Wilmar, Arkansas]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6184">
    <dcterms:title><![CDATA[Westinghouse Electric Corporation  Power Generation Business Unit]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Power Generation Business Unit]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[Westinghouse Electric Corporation's Power Generation Business Unit (PGBU) in Lester, Pennsylvania. The plant seen in this aerial photograph first opened operations around 1890. It included a foundry and forging shop, a steam turbine blade shop, a turbine diaphragm shop, several heavy and light machine shops, a steam turbine assembly (or erecting) shop, a gas turbine manufacturing shop, rotating test facility and development laboratory, various other laboratories, an on-site power house, sewage disposal system and fire department, the offices and manufacturing facilities of the Heat Transfer Division, as well as the office facilities housing the Steam Turbine and Gas Turbine Divisions. During the late 1960s and early 1970s, some of the steam turbine manufacturing facilities located at the Lester plant were closed and replaced with new plants built in Charlotte and Winston-Salem, North Carolina. Over the period of 1980 to 1983, non-manufacturing personnel of the Steam Turbine Division were relocated to new headquarters in Orlando, Florida. In 1985 all gas turbine manufacturing was transferred to Westinghouse Canada, in Hamilton, Ontario, and also contracted out to Mitsubishi Heavy Industries (MHI) of Japan.  The Lester plant was closed in 1986, almost 100 years after it started operation. During World War II, the Lester plant was converted to supplying heavy military equipment for the war effort.  It is believed that the peak employment level at the site was on the order of 15,000.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original color photograph.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1940-1981]]></dcterms:created>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original color photograph.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[452 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 color photograph]]></dcterms:medium>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation Power Generation Business Headquarters, Lester, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Geography Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description></rdf:RDF>
