<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dcterms="http://purl.org/dc/terms/">
<rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7459">
    <dcterms:title><![CDATA[Building Block Applications: A Guide to Turbine Element Selection]]></dcterms:title>
    <dcterms:alternative><![CDATA[Guide to Turbine Element Selection]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A guide to turbine element selection. This booklet was produced by Westinghouse Electric Corporation's Steam Turbine Division in 1973 as an applications guide for customers, power plant engineers, and Westinghouse salesmen in the field. At the time, the Steam Turbine Division was located at the site of the old Westinghouse factory in Lester, Pennsylvania. In 1982, the Steam Turbine Generator Division moved its office personnel from Pennsylvania to Orlando, Florida. The new World Headquarters building was located at The Quadrangle on Alafaya Trail, across the road from the University of Central Florida (UCF). In 1998, Westinghouse (then the CBS Corporation) sold its Power Generation Business Unit to Siemens, which, as of 2016, occupies the property at the Quadrangle.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The first Westinghouse steam turbine, a 1500kW unit, was placed in service at Hartford Power and Light Company in 1901. Since that time, Westinghouse, or Westinghouse licensees, have supplied approximately half of the steam turbine generators placed in service in the U.S. and around the world. During the late 1960s and early 1970s, Westinghouse steam turbine engineers designed and developed a series of "turbine elements" called "Building Blocks." These standardized designs for the high pressure (HP), intermediate pressure (IP), and low pressure (LP) sections or elements of the full steam turbine unit comprised the full range of Westinghouse Steam Turbine products, the largest of which were rated at some 1600MW. Turbine building block designs were developed for both fossil (3600RPM) and nuclear (1800RPM) applications.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 7-page booklet: Private Collection of Harry L. Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[Westinghouse Electric Corporation]]></dcterms:publisher>
    <dcterms:created><![CDATA[1973]]></dcterms:created>
    <dcterms:issued><![CDATA[1973]]></dcterms:issued>
    <dcterms:contributor><![CDATA[Jaeger, Harry L.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 7-page booklet.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[20.6 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[7-page booklet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Steam Turbine Division, Westinghouse Electric Corporation, Lester, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by Westinghouse Electric Corporation.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6437">
    <dcterms:title><![CDATA[Early Westinghouse Gas Turbine Power Generating Unit]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Gas Turbine Power Generating Unit]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[This photograph shows the installation of the first Westinghouse 40MW model W501A gas turbine, located at the Dow Chemical Company's on-site power generation facilities in Freeport, Texas. Dow was a major customer of Westinghouse gas turbine generators and was a pioneer in application of gas turbines for industrial on-site power generation, combined with exhaust heat recovery for production of process steam or additional power. Dow’s first gas turbine, also installed in this way at the facility in Freeport, was a Westinghouse 30MW model W301, which started operation in 1965. In all, Dow installed some 20 Westinghouse gas turbines in Texas and at their site in Plaquemine, Louisiana. Today, this combined heat and power (CHP) application of gas turbines is commonplace and is also known as gas turbine cogeneration.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation.  As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle.  From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped.  The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 33mm slide: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1968]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 33mm slide.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[104 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[33mm slide]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Dow Chemical Plant, Freeport, Texas]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Geography Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[Science Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally owned by Harry Jaeger.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7021">
    <dcterms:title><![CDATA[Letter from Virgil C. Gilbertson to Z. T. Stuart (April 22, 1970)]]></dcterms:title>
    <dcterms:alternative><![CDATA[Letter from Gilbertson to Stuart (April 22, 1970)]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Hotels--Florida]]></dcterms:subject>
    <dcterms:description><![CDATA[A letter from Virgil C. Gilbertson, Manager of Product Publicity for the Onan Corporation, to Z. T. Stuart, General Manager of Travelodge Orlando-Sky Lake, dated April 22, 1970). In the letter, Gilbertson thanks Stuart for allowing Onan to photograph the hotel. The Travelodge Orlando-Sky Lake was located at 7101 South Orange Blossom Trail (OBT), just north of the Bee Line Toll Road, in Orlando, Florida, around 1970. The hotel was constructed in 1970 by Hymen Lake and is currently in operation as the Royal Inn. Photographs from this era show the hotel offered a free continental breakfast, heated pool, and colored television. The Onan Corporation, based in Minneapolis, Minnesota, commissioned the photographs. Onan was photographing a standby electric plant that had been recently installed at the hotel.]]></dcterms:description>
    <dcterms:creator><![CDATA[Gilbertson, Virgil C.]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 1-page typed letter from Virgil C. Gilbertson to Z. T. Stuart, April 22, 1970: <a href="http://pinecastlehistory.org/" target="_blank">Pine Castle Historical Society</a>, Pine Castle, Florida.]]></dcterms:source>
    <dcterms:created><![CDATA[1970-04-22]]></dcterms:created>
    <dcterms:dateSubmitted><![CDATA[120 KB]]></dcterms:dateSubmitted>
    <dcterms:contributor><![CDATA[Lake, Harriett]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 1-page typed letter from Virgil C. Gilbertson to Z. T. Stuart, April 22, 1970.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/179" target="_blank">Sky Lake Collection</a>, Orange County Collection, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:medium><![CDATA[1-page typed letter on Onan Corporation letterhead]]></dcterms:medium>
    <dcterms:language><![CDATA[eng ]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Onan Corporation, Minneapolis, Minnesota]]></dcterms:coverage>
    <dcterms:coverage><![CDATA[ Travelodge Orlando-Sky Lake, Sky Lake, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by Virgil C. Gilbertson.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by the <a href="http://pinecastlehistory.org/" target="_blank">Pine Castle Historical Society</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7437">
    <dcterms:title><![CDATA[Memorandum from D. H. Pierce (April 12, 1988)]]></dcterms:title>
    <dcterms:alternative><![CDATA[Memo from Pierce (Apr. 12, 1988)]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A memorandum from D. H. Pierce, General Manager of Westinghouse Electric Corporation's Power Systems Operation Division, regarding the development of joint ventures with ASEA Brown Boveri (ABB). The partnership would serve power generation, transmission, and distribution markets in North American and Latin America.<br /><br />In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.]]></dcterms:description>
    <dcterms:creator><![CDATA[Pierce, D. H.]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 2-page typed memorandum from D. H. Pierce, April 12, 1988: Private Collection of Harry L. Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[1988-04-12]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry L.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 2-page typed memorandum from D. H. Pierce, April 12, 1988.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[446 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[2-page typed memorandum]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by D. H. Pierce.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7020">
    <dcterms:title><![CDATA[Onan Corporation Generator at Travelodge Orlando-Sky Lake]]></dcterms:title>
    <dcterms:alternative><![CDATA[Onan Generator at Travelodge Orlando-Sky Lake]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Hotels--Florida]]></dcterms:subject>
    <dcterms:description><![CDATA[The Onan Corporation generator at the Travelodge Orlando-Sky Lake, located at 7101 South Orange Blossom Trail (OBT), just north of the Bee Line Toll Road, in Orlando, Florida, around 1970. The hotel was constructed in 1970 by Hymen Lake and is currently in operation as the Royal Inn. Photographs from this era show the hotel offered a free continental breakfast, heated pool, and colored television. The Onan Corporation, based in Minneapolis, Minnesota, commissioned the photographs. Onan was photographing a standby electric plant that had been recently installed at the hotel.]]></dcterms:description>
    <dcterms:creator><![CDATA[Keagle, Robert Travis]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 8 x 10 inch black and white photograph: <a href="http://pinecastlehistory.org/" target="_blank">Pine Castle Historical Society</a>, Pine Castle, Florida.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<a href="http://power.cummins.com/" target="_blank">Onan Corporation</a>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1970-04-22]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1970-04-22]]></dcterms:dateCopyrighted>
    <dcterms:dateSubmitted><![CDATA[137 KB]]></dcterms:dateSubmitted>
    <dcterms:contributor><![CDATA[Lake, Harriett]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 8 x 10 inch black and white photograph.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/179" target="_blank">Sky Lake Collection</a>, Orange County Collection, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:medium><![CDATA[1 black and white photograph]]></dcterms:medium>
    <dcterms:language><![CDATA[eng ]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image ]]></dcterms:type>
    <dcterms:coverage><![CDATA[Travelodge Orlando-Sky Lake, Sky Lake, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally created by Robert Travis Keagle and published by the <a href="http://power.cummins.com/" target="_blank">Onan Corporation</a>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by the <a href="http://power.cummins.com/" target="_blank">Onan Corporation</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7738">
    <dcterms:title><![CDATA[PACE 320 Combined-Cycle Power Plant Diagram]]></dcterms:title>
    <dcterms:alternative><![CDATA[PACE Combined-Cycle Plant]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Energy--United States]]></dcterms:subject>
    <dcterms:description><![CDATA[A simplified power cycle diagram depicting the concept in which two Westinghouse 501 (W501) gas turbines exhaust into individual heat recovery steam generators (HRSGs) and produce steam for a 100 MW steam turbine. In 1970, Westinghouse introduced the Power at Combined Efficiency (PACE) pre-engineered combined-cycle power plant concept. The Power at Combined Efficiency (PACE) Engineering Manager was Paul A. Berman, who is often considered "The Father" of the Westinghouse combined-cycle plant. With the Westinghouse 501D rated at approximately 100 MW, the total power output of the Power at Combined Efficiency (PACE) plant was approximately 300MW.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major corporate management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation in 1998, additional buildings were added to the Quadrangle.]]></dcterms:description>
    <dcterms:source><![CDATA[Original diagram: <a href="https://richesmi.cah.ucf.edu/omeka/items/show/6593" target="_blank"><em>PACE: The Westinghouse Combine Cycle Packaged Powerplant</em></a>. <a href="https://www.siemens.com/global/en/home.html" target="_blank">Westinghouse Electric Corporation</a>: Private Collection of Harry L. Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1970-1975]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry L.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original diagram: <a href="https://richesmi.cah.ucf.edu/omeka/items/show/6593" target="_blank"><em>PACE: The Westinghouse Combine Cycle Packaged Powerplant</em></a>. <a href="https://www.siemens.com/global/en/home.html" target="_blank">Westinghouse Electric Corporation</a>.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[405 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 diagram]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Lester, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6189">
    <dcterms:title><![CDATA[The Generation Gap, Special Edition]]></dcterms:title>
    <dcterms:alternative><![CDATA[Generation Gap]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[An article published in <em>The Generation Gap</em>, Westinghouse Electric Corporation's newsletter, regarding the relocation of the company's Steam Turbine-Generator Division (STGD) from Lester and Pittsburgh, Pennsylvania to Orlando, Florida, starting in 1982. A new headquarters building was being constructed at The Quadrangle, at the corner of Alafaya Trail and University Boulevard. Temporary office space was located in a renovated shopping center on East Colonial Drive. Shown in photographs on the second page are executives uncovering the cornerstone of the new building (dated February of 1982), but the building was not ready to have it installed as yet.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. The company relocated its Steam Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida, beginning in 1981. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought CBS network. It then changed its name to the CBS Corporation.]]></dcterms:description>
    <dcterms:creator><![CDATA[Westinghouse Communications Department (for Power Generation Marketing Dept.)]]></dcterms:creator>
    <dcterms:source><![CDATA[Original 4-page article: <em>The Generation Gap</em>, Spring 1982: Private Collection of Harry Jaeger.]]></dcterms:source>
    <dcterms:publisher><![CDATA[<em>The Generation Gap</em>]]></dcterms:publisher>
    <dcterms:created><![CDATA[ca. 1982-03]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1982-03]]></dcterms:dateCopyrighted>
    <dcterms:issued><![CDATA[ca. 1982-03]]></dcterms:issued>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 4-page article: <em>The Generation Gap</em>, Spring 1982.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="https://get.adobe.com/reader/" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[837 KB]]></dcterms:extent>
    <dcterms:medium><![CDATA[4-page article]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Power Generation Business Unit, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:provenance><![CDATA[Originally published by <em>The Generation Gap</em>.]]></dcterms:provenance>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <em>The Generation Gap</em> and is provided here by RICHES of Central Florida for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/7730">
    <dcterms:title><![CDATA[Westinghouse 501D5 EconoPac-Model Power Plant]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse 501D5 Power Plant]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Energy--United States]]></dcterms:subject>
    <dcterms:description><![CDATA[A model of Westinghouse 501D5 (W501D5) EconoPac-packaged simple-cycle power plant around 1983. This diagram illustrates the arrangements of all major components and subsystems. A full gas turbine power plant arrives at site as a set of prepackaged modules for quick field assembly. a glycol cooler was used for hydrogen-cooled generator, which was standard scope before large air-cooled generators became available for the application.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major corporate management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation in 1998, additional buildings were added to the Quadrangle.]]></dcterms:description>
    <dcterms:source><![CDATA[Original diagram: Private Collection of Harry L. Jaeger.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1983]]></dcterms:created>
    <dcterms:contributor><![CDATA[Jaeger, Harry L.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original diagram.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:format><![CDATA[image/jpg]]></dcterms:format>
    <dcterms:extent><![CDATA[1.07 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[1 diagram]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Still Image]]></dcterms:type>
    <dcterms:coverage><![CDATA[Combustion Turbine Systems Division, Westinghouse Electric Corporation, Concordville, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6187">
    <dcterms:title><![CDATA[Westinghouse Power Generation Booklet]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse Power Generation]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Orlando (Fla.)]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:description><![CDATA[A commemorative booklet published in 1993 or 1994 by Westinghouse's Power Generation Business Unit (PGBU) in Orlando, Florida, to celebrate 100 years of "Westinghouse Power Generation."  The booklet tells the history from the founding of the business by George Westinghouse (1846-1914) and its continuing progress through 100 years of service to the electric utility industry and other industrial customers worldwide. The booklet also describes the products and services, technology and manufacturing capabilities of the Power Generation Business Unit of the early 1990s.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.]]></dcterms:description>
    <dcterms:source><![CDATA[Original 32-page booklet, 1993.]]></dcterms:source>
    <dcterms:created><![CDATA[1993]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[1993]]></dcterms:dateCopyrighted>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of original 32-page booklet, 1993.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="https://get.adobe.com/reader/" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[5.02 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[32-page booklet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Westinghouse Electric Company, Turtle Creek, Pittsburgh, Pennsylvania]]></dcterms:coverage>
    <dcterms:coverage><![CDATA[Westinghouse Power Generation Business Unit, Orlando, Florida]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description><rdf:Description rdf:about="https://richesmi.cah.ucf.edu/omeka/items/show/6590">
    <dcterms:title><![CDATA[Westinghouse: The First 100+ Years]]></dcterms:title>
    <dcterms:alternative><![CDATA[Westinghouse: First 100+ Years]]></dcterms:alternative>
    <dcterms:subject><![CDATA[Westinghouse Electric Corporation]]></dcterms:subject>
    <dcterms:subject><![CDATA[ Westinghouse, George, 1846-1914]]></dcterms:subject>
    <dcterms:description><![CDATA[A pamphlet detailing the legacy of George Westinghouse (1846-1914) and his business entrepreneurship. Originally called the Westinghouse Electric Company, Westinghouse founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945.]]></dcterms:description>
    <dcterms:creator><![CDATA[Morgan, Schulter C.]]></dcterms:creator>
    <dcterms:source><![CDATA[Reprint of original 16-page pamphlet: Private Collection of George E. Baker.]]></dcterms:source>
    <dcterms:created><![CDATA[ca. 1986]]></dcterms:created>
    <dcterms:dateCopyrighted><![CDATA[ca. 1986]]></dcterms:dateCopyrighted>
    <dcterms:contributor><![CDATA[Baker, George E.]]></dcterms:contributor>
    <dcterms:isFormatOf><![CDATA[Digital reproduction of reprinted 16-page pamphlet.]]></dcterms:isFormatOf>
    <dcterms:isPartOf><![CDATA[<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.]]></dcterms:isPartOf>
    <dcterms:requires><![CDATA[<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>]]></dcterms:requires>
    <dcterms:format><![CDATA[application/pdf]]></dcterms:format>
    <dcterms:extent><![CDATA[3.2 MB]]></dcterms:extent>
    <dcterms:medium><![CDATA[16-page pamphlet]]></dcterms:medium>
    <dcterms:language><![CDATA[eng]]></dcterms:language>
    <dcterms:language><![CDATA[ fre]]></dcterms:language>
    <dcterms:language><![CDATA[ ger]]></dcterms:language>
    <dcterms:language><![CDATA[ ita]]></dcterms:language>
    <dcterms:type><![CDATA[Text]]></dcterms:type>
    <dcterms:coverage><![CDATA[Pittsburgh, Pennsylvania]]></dcterms:coverage>
    <dcterms:accrualMethod><![CDATA[Donation]]></dcterms:accrualMethod>
    <dcterms:mediator><![CDATA[History Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Economics Teacher]]></dcterms:mediator>
    <dcterms:mediator><![CDATA[ Science Teacher]]></dcterms:mediator>
    <dcterms:rightsHolder><![CDATA[This resource is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.]]></dcterms:rightsHolder>
</rdf:Description></rdf:RDF>