Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Still Image
A static visual representation. Examples of still images are: paintings, drawings, graphic designs, plans and maps. Recommended best practice is to assign the type "text" to images of textual materials.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Combustion Turbine Operations Mug
Alternative Title
Westinghouse Electric Mug
Subject
Energy--United States
Description
A mug for Westinghouse Electric's Combustion Turbine Operations (CTO) mug, which was given to each employee who transferred from the CTO's location in Concordville, Pennsylvania, to Orlando, Florida, where the division was being relocated. CTO was established as part of the Power Systems Business Unit's (PSBU) Generation Technology Systems Division (GTSD). After relocation, CTO was incorporated into the Power Generation Business Unit (PGBU).<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation, additional buildings were added to the complex. In 1994, after a major corporate management shuffling and commitment to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings were rented and then, after PGBU was sold to Siemens Corporation in 1998, additional buildings were added to the Quadrangle.
Type
Still Image
Source
Original color photographs: Private Collection of Harry L. Jaeger.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original color photographs.
Coverage
Westinghouse Power Generation Business Unit, Orlando, Florida
Contributor
Jaeger, Harry L.
Date Created
ca. 1987
Format
image/jpg
Extent
434 KB
552 KB
Medium
1 color photograph
Language
eng
Mediator
History Teacher
Rights Holder
There is no known copyright for this resource, which is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Jaeger, Harry L.
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Combustion Turbine Operations
combustion turbines
CTO
cups
Generation Systems Technology Division
GSTD
mugs
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/e3edfc45f07267d267db8bab420d1c44.pdf
ebdb949d164ef7a31abc7b555c569767
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Combustion Turbine Operations Organizational Charts
Alternative Title
Westinghouse Organizational Charts
Subject
Westinghouse Electric Corporation
Description
An organizational chart of Westinghouse Electric Corporation's Combustion Turbine Operations, 1987. In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original organizational charts, May 12, 1987: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original organizational charts, May 12, 1987.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Contributor
Jaeger, Harry L.
Date Created
1987-05-12
Format
application/pdf
Medium
8 organizational charts
Language
eng
Mediator
History Teacher
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. D. Hattangadi
A. E. Jordan
A. E. Wesson
A. J. Kosinski
A. J. Scalzo
A. M. Vargo
A. Martens
A. Pagliei
A. Zabrodsky
B. E. Snow
B. F. DePuy
B. L. McKinley
B. P. Maxwell
C. A. Bizub
C. A. DelVecchio
C. A. Rohr
C. C. Shah
C. J. Balzano
C. J. Bowden
C. M. Volk
C. W. Metzler
C. W. Thibedeau
Carole A. DelVecchio
Combustion Turbine Operations
D. A. Horazak
D. Bunce
D. J. Chapman
D. J. Ruggiero
D. L. Moen
D. M. Bless
D. R. Fraser
D. T. Enteman
D. V. Padgett
Douglas R. Fraser
E. J. Barsness
E. U. Ernst
F. A. Cleaton
F. A. Pisz
F. K. Gabriel
F. Theil
G. A. Myers
G. A. Schott
G. C. Kaufman
G. C. VanArtsdalen
G. F. Pierson
G. J. Robinson
G. J. Savastano
G. L. Eaton
G. L. Thomas
G. M. Bove
H. H. Hielbronner
H. H. Wisch
H. L. Jaeger
H. R. Kacowka
Hank Kacowka
Harry L. Jaeger
Henry R. Kacowka
J. A. Rumancik
J. Citino
J. Donlan
J. F. Barrett
J. F. Thompson
J. H. Borden
J. H. Rickards
J. J. Shields
J. Kain
J. M. Allen
J. P. Smed
J. Pavel
J. R. Corr
J. T. Bonsall
J. T. Lipscomb
J. Turner
J. W. Myers
James H. Borden
K. G. Hultgren
K. H. Seliger
K. K. Jones
K. M. Thomas
K. R. Cooper
K. R. Wescott
K. W. Johnson
Keith W. Johnson
L. A. Loden
L. D. McLaurin
L. G. Miscannon
L. R. Wood
Leroy D. McLaurin
M. A. Bremmer
M. E. Warner
M. J. Hawk
M. L. Victor
M. M. Wright
M. R. Butler
N. Hart
N. Middleton
O. L. Bertsch
P. A. Berman
P. E. Troztel
P. J. Fantacone
P. J. Tyler
P. L. Sorrell
P. W. Pillsbury
R. A. Merker
R. A. Olsen
R. Brown
R. C. Bilkey
R. D. Miller
R. D. Peterson
R. D. Worth
R. E. Walls
R. E. Williams
R. G. Waugh
R. I. Burfield
R. J. Antos
R. J. Thoman
R. L. Novak
R. M. Lee
R. Murray
R. S. McIntyre
R. V. Garland
R. W. Kiscaden
Ray I. Burfield
Reginald S. McIntyre
S. A. Mirza
S. E. Mumford
S. F. Arlington
S. G. Sujan
S. M. Kron
S. Subbaswamy
S. T. Cloyd
S. W. Field
Skip Middleton
T. Brown
T. D. Paige
T. E. Campbell
T. J. Carr
T. J. Rabas
T. S. Baldwin
Thomas E. Campbell
Tom Campbell
V. A. Ogale
V. J. Bruno
W. C. Emmerling
W. E. North
W. F. Boyd
W. H. Dickson
W. J. Englehart
W. J. Hall
W. J. Snarponis
W. K. Howard
W. L. McCarty
W. V. Clarke
W. W. Outen
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/152359cae01687e375323fe6b04747fc.jpg
d28aeb099175acd576dd57bed31a6f7e
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Memorandum from Thomas E. Campbell to Energy Systems Technology Divisions (May 7, 1987)
Alternative Title
Memo from Campbell (May 7, 1987)
Subject
Orlando (Fla.)
Westinghouse Electric Corporation
Description
A memorandum from Thomas E. Campbell regarding recent appointments and realignments of Westinghouse Electric Corporation's Generation Technology Systems Division (GTSD) in 1987. The Steam Turbine Generator Division (STGD) was taking shape under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group) through the changes in management leadership of the team of Bob Ractcliffe and Howard Pierce, Tom Campbell (under Nat Woodsen and Jim Moore), Frank R. Bakos of the Power Generation Business Unit (PGBU), and Randy H. Zwirn, who remained at the executive level for 20 years, through the PGBU acquisition in 1998.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original 1-page typed memorandum from Thomas E. Campbell, May 7, 1987: Private Collection of Harry L. Jaeger.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original 1-page typed memorandum from Thomas E. Campbell, May 7, 1987.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Creator
Campbell, Thomas E.
Contributor
Jaeger, Harry L.
Date Created
1987-05-07
Format
image/jpg
Extent
768 KB
Medium
1-page typed memorandum
Language
eng
Mediator
History Teacher
Provenance
Originally created by Thomas E. Campbell.
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. J. Scalzo
Carol DelVecchio
Combustion Turbine Operations
Energy Systems Service Divisions
ESSD
G. C. Kaufman
H. R. Kacowka
Hank Kacowka
Henry R. Kacowka
J. A. Rumancik
J. H. Borden
James H. Borden
N. D. Woodson
P. A. Berman
R. S. McIntyre
R. W. Johnson
Reginald S. McIntyre
T. E. Campbell
Thomas E. Campbell
Tom Campbell
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/0b1f6f4ec3d277267d0e602dcc66446a.pdf
7ce03cb06a26ea16b5e26079c961548a
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Original Format
7-page magazine article
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
150 MW Class 501F Design to Begin Full Load Factory Testing This Summer
Description
This article was published by the <em>Gas Turbine World</em> magazine in the May-June 1989 issue. It reports on the status of the new Westinghouse 501F advanced gas turbine that was jointly developed with Mitsubishi Heavy Industries (MHI). At the time, the prototype or first-build was being completed at the MHI factory in Japan. The 150MW-class 501F was the first new gas turbine design to be offered by Westinghouse Electric Corporation following the move of the Combustion Turbine Operations department of the Power Generation Business Unit (PGBU) to Orlando, Florida, in 1987.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Date Created
ca. 1989-05
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Creator
Farmer, Robert
Source
Original 7-page magazine article: Farmer, Robert. "150 MW Class 501F Design to Begin Full Load Factory Testing This Summer." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 19, No. 3, May-June 1989: Private Collection of Harry Jaeger.
Source Repository
Private Collection of Harry Jaeger
Rights Holder
Copyright to this resource is held by Gas Turbine World and is provided here by RICHES of Central Florida for educational purposes only.
Transcript
None
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Alternative Title
150 MW Class 501F Design to Begin Full Load Factory Testing
Subject
Westinghouse Electric Corporation
Turbines
Publisher
<a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>
Date Copyrighted
ca. 1989-06
Date Issued
ca. 1989-06
Contributor
Jaeger, Harry
Is Format Of
Digital reproduction of original 7-page magazine article: Farmer, Robert. "150 MW Class 501F Design to Begin Full Load Factory Testing This Summer." <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>, Vol. 19, No. 3, May-June 1989.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Format
application/pdf
Extent
20.8 MB
Medium
7-page magazine article
Language
eng
Type
Text
Accrual Method
Donation
Mediator
History Teacher
Science Teacher
Provenance
Originally created by Robert Farmer and published by <a href="http://www.gasturbineworld.com/" target="_blank"><em>Gas Turbine World</em></a>.
Curator
Jaeger, Harry
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
501F
air-cooled turbines
Auguie Scalzo
coal-fired plants
combined cycle
Combustion Turbine Operations
compressors
cooled combustors
CTO
dual-fuel combustors
ECY768L X45L U 520L Inco 738
engineering
factories
factory
gas turbines
HRSG
IGCC
low-NOx hybrid combustors
MF-111
MHI
Mitsubishi Heavy Industries
Moon Light
MTFIN
MW701D
NACA
packaged plants
power generation
Power Logic II control system
Power Projects Development
protective coatings
Robert Farmer
simple cycle
Takasago Works
testing
tilting-pad bearings
variable geometry guide vanes
W1501
W501D5
W65
Westinghouse Electric Corporation