1
100
5
-
https://richesmi.cah.ucf.edu/omeka/files/original/42f8e1373a762751be359b4b0e257120.pdf
3478f4891532b8bd9704b4a362bb1624
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Generation Projects Organizational Charts
Alternative Title
Westinghouse Organizational Charts
Subject
Orlando (Fla.)
Westinghouse Electric Corporation
Description
An organizational chart of Westinghouse Electric Corporation's Generation Projects I, managed by C. A. Weeks, and Generation Projects II, managed by D. M. Johnson. In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original organizational charts, August 1986: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original organizational charts, August 1986.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Contributor
Jaeger, Harry L.
Date Created
1986-08
Format
application/pdf
Medium
2 organizational charts
Language
eng
Mediator
History Teacher
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. A. Zanazanian
A. Andrews
A. Moss
Amos Fairly
Art Sullivan
B. Bean
B. Crenshaw
B. D. Gralla
B. E. Sandman
B. McNichols
Barbara Maebert
Bill McDowell
Bill Montgomery
Bill Schoff
Billy Hogge
Bob Bienkowski
Bob Deutschman
Bucky Walter
C. Allgeier
C. Buscemi
C. Covey
C. D. Sloan
C. Edwards
C. L. Sturla
C. Mayhall
C. S. Mariany
Curt Smith
D. C. Beddingfield
D. Childree
D. M. Johnson
D. S. Brubaker
D. Smith
Dan Kenipp
Derek Anderson
Don Matson
E. Bean
Earl Bartels
Ellie Hettig
F. Foulk
F. Kozy
F. X. Baldino
G. Brammer
G. Price
G. Runnion
Gary Sharp
Generation Projects
Gloria Ernst
H. Holowiak
Herb Wheeler
J. B. Bostick
J. Crisler
J. E. Freshwater
J. H. Cusack
J. Heller
J. J. Leemon
J. L. Larkin
J. L. McClain
J. P. Forquer
J. R. Auman
J. S. Olszewski
J. Stider
Joe Shade
John B. Bostick
John Mathis
K. A. Steinebronn
L. Batsch
L. Crist
L. Harris
L. K. Koering
L. Krogel
L. Richie
L. Stellhorn
M. D. Harmon
M. Flandemeyer
M. H. Craig
M. Maynard
Mark Heusel
Mary Burke
Mickey Mobley
Mike McCormick
O. L. Walter
orlando
P. Heinzpeter
P. J. Murphy
Paul Strauss
R. D. Howard
R. D. Schulte
R. Koubek
R. M. Johnson
R. Misback
R. Mould
R. P. Duverneau
R. Rapagnani
R. Voigt
R. W. Hebert
R. Woodward
Robert Huneke
Ron Bauer
S. E. Bennett
S. Holey
S. J. Piermont
S. L. Jones
S. Lambert
S. Laskiewicz
Sandy Quintilliani
Sean Furey
Shirley Redden
Steve Curley
T. J. Kuchma
T. M. Stott
T. M. Sullivan
T. Paige
Tom Battinieri
Tom Stel
Toni Yagami
W. Cox
W. H. Davis
W. J. Rolston
W. O. O'Donnell
W. R. Navey
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/e93f61acac2c9bfc078a433cf125bc70.pdf
f5c160993e8f4b8e428c95a5469a9586
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Memorandum from Frank R. Bakos (May 14, 1986)
Alternative Title
Memo from Bakos (May 14, 1986)
Subject
Westinghouse Electric Corporation
Description
A memorandum from Marketing Manager K. A. Oleson and Commercial Operations Manager A. R. Collier to Electric Utility Sales and Electric Utility International regarding the reorganization of Westinghouse Electric Corporation's Steam Turbine Generator Division (STGD). In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original 8-page typed memorandum from Frank R. Bakos, May 14, 1986: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original 8-page typed memorandum from Frank R. Bakos, May 14, 1986.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Creator
Bakos, Frank R.
Contributor
Jaeger, Harry L.
Date Created
1986-05-14
Format
application/pdf
Extent
2.14 MB
Medium
8-page typed memorandum
Language
eng
Mediator
History Teacher
Provenance
Originally created by Frank R. Bakos.
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. Vukmir
Bob Bristol
Bob Ractcliffe
Bucky Walter
C. A. Weeks
C. James Craig
C. L. Sturla
Clem Eicheldineger
Commercial Integration Department
Consumers Power Company
Craig A. Weeks
Craig Sturla
D. J. Richards
D. L. Miller
D. M. Johnson
D. R. Beynon
Daniel T. Christianson
Dave Miller
David L. Miller
Dick Bober
Donald L. Fuller
Donald M. Johnson
E. A. Watjen
E. J. McNeill
E. K. Johnson
E. V. Somers
Energy Systems Service Divisions
Ernie Heina
ESSD
F. Lepee
F. M. Stutzbach
F. R. Bakos
Frank R. Bakos
Fred Sperry
G. E. Baker
G. E. Kubanczek
G. E. Williams
G. J. Meyer
G. O. Percival
G. S. Thomas
G. W. Gamble
GE
General Electric
Generation Projects
George E. Baker
George W. Dillon
Glenn W. Gamble
H. C. Walls
H. S. Grassian
Harv Grassian
Innovative Technologies, Inc.
International Service Operations
ITI
J. A. Johnson
J. A. Triggiani
J. Alba
J. Antonijuan
J. B. Bostick
J. C. Hoebel
J. E. Morris
J. F. Sperry
J. Goumas
J. Headden
J. J. Leemon
J. M. Roth
J. P. McGrath
J. S. Moore
J. S. Taylor
J. T. Moyers
J. W. Irons
J. W. Jenkins
James J. Doran
Joe Leemon
John B. Bostick
Joseph J. Leblang
K. A. Steinebronn
Ken Johnson
Kurt A. Steinebronn
L. E. Elder
L. L. Williams
L. R. Benson
Lou E. Pisano
M. J. Parvin
M. Lopez-Lopez
NSID
Nuclear Services Integration Division
O. L . Walter
O. L. Walter
O. Meeuwis
Operating Plant Projects
orlando
P. A. Szuch
Palisades Nuclear Generating Station
Palisades Nuclear Station
Peter L. Ruddle
PGCD
Power Generation Commercial Division
Power Systems Business Unit
PSBU
R. A. Matheny
R. A. Stough
R. A. White
R. Bober
R. E. G. Ractliffe
R. G. Johnson
R. G. Perez
R. H. Baulig
R. H. Heisey
R. J. Muth
R. J. Phillips
R. L. Bristol
R. M. Andersen
R. T. Greenwood
R. U. Mathieson
R. W. Buchholz
R. W. Herbert
R. W. Woodward
Raymond J. Sero
Richard G. Johnson
Robert E. G. Ractliffe
Rod Herbert
Roger T. Greenwood. E. V. Heina
Roger W. Woodward
Roy W. Jones
S. P. Swigart
T. A. Lordi
T. E. Szabo
T. J. Kchma
T. J. Kuchma
T. M. Anderson
T. R. Puryear
Thomas E. Dunn
Thomas H. Dent
Thomas J. Mithlo
Thomas M. Anderson
Tom Kuchma
U.S. Nuclear Projects Department
V. P. Burke
V. S. Andersen
W. L. Reuler
W. Spencer
W. W. Hicks
Westinghouse Electric Corporation
Westinghouse International Service Company
William E. Mendez, Jr.
WISC
-
https://richesmi.cah.ucf.edu/omeka/files/original/3ed0365c93ad653b74500cd6943cd83b.pdf
5b0a0c9c5e739da302784e6873283b94
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Power Generation Organizational Charts
Alternative Title
Westinghouse Organizational Charts
Subject
Orlando (Fla.)
Westinghouse Electric Corporation
Description
An organizational chart of Westinghouse Electric Corporation's Power Generation Operations Division (PGOD), managed by D. H. Pierce, and Turbine Generator Commercial Division (TGCD), managed by R. E. G. Ractcliff. In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original organizational charts, July 15, 1985: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original organizational charts, July 15, 1985.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Contributor
Jaeger, Harry L.
Date Created
1985-07-15
Format
application/pdf
Medium
2 typed charts
Language
eng
Mediator
History Teacher
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. A. Lagore
A. Bugge
A. C. Martin
A. D. Cooper
A. F. Axt
A. J. Scalzo
A. M. Florito
A. M. Vargo
A. O. Cooper
A. S. Duffendack
A. S. Workum
Alan D. Cooper
B. P. Schniepp
Bob Ractcliffe
C. A. Weeks
C. B. Yaskanich, Jr.
C. D. Honeycutt
C. D. Jennings
C. E. Seglem
C. G. Butterfield
C. K. Sturla
C. R. Marquard
C. W. Meck
Craig A. Weeks
D. H. Pierce
D. Howard Pierce
D. L. Miller
D. M. Johnson
D. R. Bennett
D. R. Hamzavi
D. R. Healey
D. R. Jones
D. R. Pease
D. R. Podolmy
D. R. Taylor
D. T. Smith
D. W. Drehuff
David R. Hamzavi
Donald M. Johnson
E. A. Izzo
E. D. Lovera
E. J. Barsness
E. J. Cattabiani
E. J. Kessler
E. K. Johnson
E. V. Heina
F. A. Artusa
F. K. Gabriel
F. R. Hoguet
F. R. Vaccaro
G. C. Lamonettin
G. C. Schatz
G. D. Albrecht
G. L. Bartsch
G. W. Gamble
G. W. Norwood
George C. Lamonettin
H. A. Vedner
H. Art Vedner
H. C. Chase
H. C. Weatherman
H. J. Finney
H. S. Grassian
Harry L. Jaeger
J. A. Bardi
J. A. Fickling
J. A. Isasi
J. A. Reker
J. Alba
J. Borden
J. C. Fenza
J. Citino
J. D. Conrad
J. E. Donahue
J. E. Moir
J. F. Onofrey
J. F. Phillips
J. F. Sperry
J. F. Traexler
J. F. Williams
J. J. Leemon
J. M. Foley
J. M. Panoya
J. P Kessinger
J. S. Neri
J. W. McMasters
J. W. Randell
J. W. Ross
Joe Leemon
K. A. Steinebronn
K. W. Johnson
Keith W. Johnson
Ken Johnson
Kurt A. Steinebronn
L. E. Harper
L. K. Huber
L. R. Knox
L. R. Southall
M. Coffman
M. D. Costa
M. D. Costa. T. A. Moss
M. D. Gill
M. E. Glasgow
M. J. Davis
M. V. Wohlscmegel
Michael D. Costa
Mike Costa
O. L. Walter
O. M. Hauge
orlando
P. B. Messina
P. R. Ratliff
P. R. Szeker
PGCD
PGOD
Power Generation Operations Division
Power Generator Commercial Division
R. A. Gebbia
R. B. Carpenter
R. B. Williamson
R. Bober
R. C. Young, Jr.
R. E. G. Ractliffe
R. E. Nowak
R. F. Schelle
R. J. Antos
R. J. Murphy
R. J. Ramenkamp
R. L. Brooks
R. L. Kendrick
R. L. Nolan
R. L. Osborne
R. O. A. Muscedere
R. Pigott
R. S. McIntyre
R. W. Deem
R. W. Gaul
R. W. Herbert
Robert E. G. Ractliffe
Rod Herbert
S. G. Sujam
S. R. Shawley
T. J. Kuchma
T. M. Szewczuk
Tom Kuchma
V. N. Fahy
W. A. Davis
W. C. Nygren
W. F. Snow
W. J. Froehlich
W. S. Smith III
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/4039408ab5af1e00ea5e10ab9807934e.pdf
00fdec778fedfbf16b503e496298236d
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Memorandum from K. A. Oleson and A. R. Collier to Electric Utility Sales and Electric Utility International (September 14, 1983)
Alternative Title
Memo from Oleson & Collier to Electric Utility Sales & Electric Utility International (Sept. 14, 1983)
Subject
Orlando (Fla.)
Westinghouse Electric Corporation
Description
A memorandum from Marketing Manager K. A. Oleson and Commercial Operations Manager A. R. Collier to Electric Utility Sales and Electric Utility International regarding the reorganization of Westinghouse Electric Corporation's Steam Turbine Generator Division (STGD). In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original 15-page typed memorandum from K. A. Oleson and A. R. Collier to Electric Utility Sales and Electric Utility International, September 14, 1983: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original 15-page typed memorandum from K. A. Oleson and A. R. Collier to Electric Utility Sales and Electric Utility International, September 14, 1983.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Creator
Oleson, K. A.
Collier, A. R.
Contributor
Jaeger, Harry L.
Date Created
1983-09-14
Format
application/pdf
Extent
1.51 MB
Medium
15-page typed memorandum
Language
eng
Mediator
History Teacher
Provenance
Originally created by K. A. Oleson and A. R. Collier.
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
A. A. Soares
A. A. Zanazanian
A. Bugge
A. C. Martin
A. F. Axt
A. L. Andrews
A. R. Collier
A. S. Workum
A. Stock
Alafaya Trail
B. J. Harkiewicz
B. Tadd
B. W. Morrison
C. E. Davies
C. L. Schoolcraft
C. L. Sturla
C. W. Meck
Craig A. Weeks
Craig Sturla
D. A. Pacyna
D. Amos
D. B. Carson
D. C. Beddingfield
D. Gringer
D. H. Pierce
D. Howard Pierce
D. L. Miller
D. M. Johnson
D. R. Hamzavi
D. R. Spraker
D. W. Drehoff
David R. Hamzavi
Debbie Mursch
Donald M. Johnson
E. A. Izzo
E. C. Bartels
E. J. Barsness
E. J. Kilpela
E. K. Johnson
E. V. Heina
Electric Utility International
Electric Utility Sales
F. A. Rosenthal
F. A. Willa
F. C. Kao
F. J. Merry
F. R. Small
F. R. Vaccaro
F. X. Baldino
G. C. Lamonettin
G. D. Albrecht
G. E. Baker
G. H. Gundy
G. H. Stout
G. J. Dubrasky
G. J. Partridge
G. Lopez
G. M. Clark
G. M. Heck
G. W. Gamble
G. W. Kunkle
George C. Lamonettin
George E. Baker
H. E. Wheeler
H. H. Wittig
H. R. Oliver
H. R. Waltersdorf
H. S. Grassian
H. S. Progler
J. Alba
J. B. Bostick
J. B. Cienki
J. Cicinelli
J. D. Conrad
J. D. Donahue
J. E. Hutter
J. F. Gill
J. F. McNamara
J. F. Sperry
J. G. Micka
J. Green
J. H. Cusack
J. H. Sturges, Jr.
J. Heller
J. J. Leemon
J. L. Shade
J. M. Coffman
J. M. Foley
J. M. Schmerling
J. P. Forquer
J. P. Kessinger
J. R. Auman
J. R. Doyle
J. Randell
J. S. Olszewski
J. Spaziani
J. W. Jeannette
J. W. Minogue
J. Yarusinski
Joe Leemon
John B. Bostick
K. A. Oleson
K. A. Steinebronn
K. H. Steinebronn
Ken Johnson
Kurt A. Steinebronn
L. Conway
L. K. Huber
L. K. Koering
L. R. Southall
M. A. Jenkins
M. A. Neely
M. A. Saft
M. Budjevac
M. D. Costa
M. D. Gill
M. D. Harmon
M. E. Glasgow
M. Garces
M. K. Marinac
M. Salvatore
M. V. Haddad
M.A. Heusel
Michael D. Costa
Mike Costa
O. A. Willson
O. L. Walter
O. M. Hauge
orlando
P. B. Messina
P. F. McCauley
P. G. Abdalla
P. J. Murphy
P. J. Murry
P. L. McGaha
P. Rozelle
P. S. Ziemann
Paul Porter
R. B. Bienkowski
R. B. Carpenter
R. B. Countess
R. B. Williamson
R. Bober
R. C. Gaskins
R. C. Kimber
R. D. Howard
R. D. Schulte
R. Dunderdale
R. E. Cannistraro
R. E. Nowak
R. F. Huff
R. F. Weddleton
R. G. Rapagnani
R. G. Thompson
R. J. Conney
R. J. Fahrer
R. J. Gross
R. J. Grutz
R. J. Hillen
R. J. Murphy
R. J. Prady
R. J. Rahenkamp
R. Koubek
R. L. Brooks
R. L. Misback
R. L. Perez
R. M Bredin
R. M. Muraski
R. P. Duverneau
R. R. Halverson
R. R. Leyendecker
R. Steiner
R. T. Greenwood
R. T. Ward
R. W. Ek
R. W. Herbert
R. W. Woodward
Rod Herbert
S. D. Grisetti
S. J. Piermont
S. L. Jones
S. L. Quick
S. M. Garvey
Steam Turbine Generator Division
STGD
T. Battieneri
T. Burke
T. E. Szabo
T. J. Kuchma
T. J. Lane
T. O'Hanlon
T. R. Eves
T. Szabo
The Quadrangle
Tom Kuchma
Tom Sullivan
University Boulevard
V. Duarte
V. N. Fahy
V. Papadopoulos
V. S. Anderson
W. Davis
W. E. Johnson
W. F. Knowles
W. J. Pagonis
W. J. Walker
W. M. Oliver
W. R. Ryan
W. Ruch
W. S. Smith
Westinghouse Electric Corporation
-
https://richesmi.cah.ucf.edu/omeka/files/original/6a7a41ba395e70956b4720030e69b8a9.pdf
e801bd436d96938ee896decae4a1e1fd
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Westinghouse Electric Collection
Alternative Title
Westinghouse Collection
Subject
Westinghouse Electric Corporation
Description
Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business the The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its divison headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando, Florida. The Power Generation Business Unit (PGBU) building was located in The Quadrangle, at 4400 Alafaya Trail. Originally, Westinghouse had purchased a large plot of land for future development that extended westward from Alafaya Trail to Rouse Road. The original headquarters was located on several acres of that land parcel close to Alafaya Trail.<br /><br />In 1994, after a major corporate management shuffling, and a top-level decision to change from an industrial manufacturing company to primarily a broadcasting/communications company, Westinghouse bought the CBS Network and changed its name to the CBS Corporation. As the PGBU grew in size, other buildings in the area were leased and then, after PGBU was sold to Siemens Corporation of Germany in 1998, additional buildings (Quad II and Quad III) were added to the original complex at the Quadrangle. From 1998 to 2003 the Orlando operation was known as Siemens-Westinghouse, after which the name of Westinghouse was dropped. The operation has been known as Siemens from that time forward.
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/" target="_blank">RICHES of Central Florida</a>.
Language
eng
Type
Collection
Coverage
Orlando, Florida
Curator
DeRosa, Peter
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
Document
A resource containing textual data. Note that facsimiles or images of texts are still of the genre text.
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
Super Tough Gator Division
Alternative Title
Super Tough Gator Division
Subject
Westinghouse Electric Corporation
Description
A document detailing the organization of Westinghouse Electric Corporation's Steam Turbine Generator Division (STGD), nicknamed the Super Tough Gator Division. In 1983, the Westinghouse power generation business operation, starting with the Steam Turbine Generator Division, was taking shape in its new Orlando headquarters under the management team led by General Manager Dr. Stan Quick (under E. J. "Gene" Cattabiani, Vice President of the Power Generation Group). This series of letters, memoranda, and charts documents the changes in management leadership at the Orlando site from 1983 through 1998, when the Westinghouse Power Genration Business was acquired by Siemens. Following the announcement of the retirement of Dr. Quick in 1984, the management was led by the team of Bob Ractcliffe and Howard Pierce. In 1987, Tom Campbell was appointed General Manager of the Power Generation Technology Systems Division under Nat Woodsen and Jim Moore, Vice Presidents of the Power Systems Business Unit. In 1988, the Power Generation Business Unit (PGBU) was formed under Frank R. Bakos, Vice President and General Manager (under Executive Vice President Ted Stern), and, in 1995, Randy H. Zwirn took the helm as Vice President and General Manager of the PGBU. He remained at the executive level for 20 years, through the PGBU acquisition by Siemens in 1998 and beyond to 2016.<br /><br />Originally called the Westinghouse Electric Company, George Westinghouse (1846-1914) founded his manufacturing company in Pittsburgh, Pennsylvania, on January 8, 1886. In 1889, he renamed his business The Westinghouse Electric and Manufacturing Company. Westinghouse's primary products include turbines, generators, motors and switchgear related to the generation, transmission, and use of electricity. The company changed its name to Westinghouse Electric Corporation in 1945. In 1981, the company began to relocate its division headquarters for the Steam-Turbine Generator Divisions from Pennsylvania (turbines from Lester and generators from Pittsburgh) to Orlando. The PGBU building was located in The Quadrangle, at 4400 Alafaya Trail.
Type
Text
Source
Original 13-page typed document, April 1983: Private Collection of Harry L. Jaeger.
Requires
<a href="http://www.adobe.com/products/reader.html" target="_blank">Adobe Acrobat Reader</a>
Is Part Of
<a href="https://richesmi.cah.ucf.edu/omeka2/collections/show/169" target="_blank">Westinghouse Electric Collection</a>, RICHES of Central Florida.
Is Format Of
Digital reproduction of original 13-page typed document, April 1983.
Coverage
Westinghouse Electric Corporation, The Quadrangle, Orlando, Florida
Contributor
Jaeger, Harry L.
Date Created
ca. 1983-04
Format
application/pdf
Extent
1.4 MB
Medium
13-page typed document
Language
eng
Mediator
History Teacher
Rights Holder
Copyright to this resource is held by <a href="https://www.siemens.com/global/en/home.html" target="_blank">Siemens</a> and is provided here by <a href="http://riches.cah.ucf.edu/" target="_blank">RICHES of Central Florida</a> for educational purposes only.
Accrual Method
Donation
Curator
Cepero, Laura
Digital Collection
<a href="https://richesmi.cah.ucf.edu/map/" target="_blank">RICHES MI</a>
External Reference
"<a href="http://www.westinghousenuclear.com/About/History" target="_blank">History</a>." Westinghouse Nuclear. http://www.westinghousenuclear.com/About/History.
"<a href="https://richesmi.cah.ucf.edu/omeka2/items/show/6422" target="_blank">Westinghouse Power Generation Booklet</a>." RICHES of Central Florida. https://richesmi.cah.ucf.edu/omeka2/items/show/6422.
. J. J. Yarusinski
A. A. Soares
A. A. Zanazanian
A. D. Cooper
A. E. Becker
A. L. Andrews
A. L. Dionisio
A. L. Stock
A. R. Collier
A. S. Duffendack
A. S. Workum
A. Zidansek
Alan D. Cooper
B. C. Tadd
B. J. Harkiewicz
B. M. Kinnie
B. Miller
C. Belmondo
C. Craig
C. E. Davies
C. L. Schoolcraft
C. L. Sturla
C. Tucker
C. W. Edminster
C. W. Meck
Craig A. Weeks
Craig Sturla
D. A. Pacyna
D. B. Carson
D. C. Beddingfield
D. D. Schaen
D. Duff
D. E. Laughlin
D. Gringer
D. H. Christopher
D. Hoffower
D. Horowitz
D. J. Heaton
D. L. Miller
D. M Johnson
D. Mills
D. R. Hamzavi
D. R. Sparker
D. W. Drehoff
D. Z. Mursch
David R. Hamzavi
E. A. Izzo
E. B. Graham
E. C. Bartels
E. J. Cattabani
E. J. Kilepla
E. K. Johnson
E. M. Crescenzi
E. P. Quaglia
E. V. Heina
F. A. Rosenthal
F. A. Serino
F. J. Merry
F. J. Mesalle
F. J. VanSolkema
F. Kao
F. O. Burckhalter
F. R. Small
F. R. Vaccaro
F. Willa
F. X. Baldino
G. A. Beach
G. B. Seath
G. C. Lamonettin
G. D. Albrecht
G. E. Baker
G. F. Zindler
G. H. Gundy
G. J. Dubrasxy
G. J. Roth
G. L. Dann
G. Lopez
G. M. Heck
G. P. Partridge
G. S. Weingarten
G. Stout
G. W. Gamble
G. W. Kunkle
George C. Lamonettin
George E. Baker
H. A. Vedner
H. Art Vedner
H. E. Wheeler
H. H. Wittig
H. Reber
H. S. Grassian
H. S. Zischkau
H. W. Lang
H. Waltersdorf
I. Schappacher
J. A. Cole
J. A. Giuliucci
J. A. Linzel
J. A. Lowrie
J. Alba
J. B. Bostick
J. Bongartz
J. C. Spaziani
J. Cicinelli
J. Cienki
J. D. Calloway
J. D. Conrad
J. F. Killen
J. F. McNamara
J. F. Sperry
J. F. Traexler
J. G. Nolan
J. Gill
J. Green
J. H. Cusack
J. Heller
J. Hutter
J. J. Collins
J. J. Leemon
J. J. Wilson
J. L. McMullen
J. M Shmerling
J. M. Foley
J. McDevitt
J. P Forquer
J. P. Butler
J. P. Morley
J. R. Alexander
J. R. Auman
J. R. Baker
J. S. Olszweski
J. Shade
J. Sturges
J. V. Stamoulis
J. W. Jeannette
J. W. Minogue
J. W. Randell
Joe Leemon
John B. Bostick
K. A. Steinebronn
K. A. Oleson
K. Davis
K. Echard
K. G. Rice
K. H. Steinebronn
K. J. Miller
K. M. Booth
K. Neill
K. W. Rugh
Ken Johnson
L. A. Pahlman
L. Brown
L. E. Erickson
L. F. Boyd
L. K. Huber
L. K. Koering
M. A. Garces
M. A. Husel
M. A. Jenkins
M. A. Neeley
M. A. Saft
M. Budjevac
M. D. Costa
M. D. Cump
M. E. Glasgow
M. Harmon
M. K. Marinac
M. R. Verbraeken
M. Salvatore
M. V. Haddad
M. W. Confer
M. Williams
Michael D. Costa
Mike Costa
O. A. Willson
O. L. Walter
O. M. Hauge
P. A. Davila
P. A. Szuch
P. E. Genutis
P. F. McCauley
P. F. Rozelle
P. G. Abdalla
P. Grodecky
P. J. Murphy
P. L. McGaha
P. M. Porter
P. Murray
P. S. Zeimann
P. V. Bancroft
P. Vaughn
R. A. Dunderdale
R. B. Bienkowski
R. B. Countess
R. B. Kennedy
R. B. Williamson
R. Bell
R. Bober
R. C. Kimber
R. C. Lockridge
R. C. Moren
R. C. Young, Jr.
R. D. Howard
R. D. Schulte
R. Desin
R. Duverneau
R. E. Cannistraro
R. E. Nowak
R. F. Weddleton
R. G. Arra
R. G. Thompson
R. H. O'Neil
R. Harbaugh
R. Harrelson
R. J. Faherer
R. J. Gross
R. J. Grutz
R. J. Hillen
R. J. Murphy
R. J. Zigmont
R. Koubeck
R. L. Brooks
R. L. Gaylord
R. L. Meeks
R. L. Misback
R. L. Perez
R. M. Bredin
R. M. Muraski
R. Parr
R. Prady
R. R. Leyendecker
R. S. Witman
R. Steiner
R. T. Greenwood
R. T. Ward
R. Taylor
R. W. Ek
R. W. Herbert
R. W. Kendrick
R. W. Woodward
Rod Herbert
S. D. Grisetti
S. J. Ginsburg
S. J. Peermont
S. L. Jones
S. L. Quick
S. M. Garvey
Steam Turbine Generator Division
STGD
Super Tough Gator Division
T. A. Gailey
T. B. O'Hanlon
T. Bonham
T. E. Burke
T. F. Cain
T. J. Battineri
T. J. Kuchma
T. J. Lane
T. L. Petit De Mange
T. M. Sullivan
T. M. Villano
T. R. Eves
T. S. Aleguas
T. Scabo
T. Scott
Tom Kuchma
V. Delima
V. M Duarte
V. M. Papadopoulos
V. N. Fahy
W. Cuthbert
W. D. Jones
W. D. Schaffer
W. D. Singer
W. E. Johnson
W. F. Dewire
W. F. Knowles
W. F. Trappen
W. H. Davis
W. H. Wittig
W. J. Pangonis
W. K Ruch
W. R. Fisher
W. R. Ryan
W. S. Smith
W. Walker
Westinghouse Electric Corporation