Browse Items (2 total)

WE00117.jpg
The 250MW-class Westinghouse 501G (W501G) gas turbine was introduced in 1994 as the largest and most efficient (38.5% LHV) 60Hz gas turbine in the world. The W501G also had an introductory combined-cycle efficiency of 58 percent.Originally called the…

WE00118.jpg
The first Westinghouse 501G (W501G) gas turbine being shipped from Hamilton Works in Hamilton, Canada, around October of 1998. This photograph was taken just after Siemens acquired the Westinghouse Electric Corporation's Power Generation Business…
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2