The installation of the Westinghouse 251 (W251) EconoPac gas turbine units at Comisión Federal de Electricidad's (CFE) generation station in Nuevo Laredo, Mexico, which began operations in 1980. Originally called the Westinghouse Electric Company,…

WE00095.jpg
A list of Power at Combined Efficiency (PACE) combined-cycle plant installations from 1973 to1984. Power at Combined Efficiency (PACE) 260 was the original designation of the plant design because the early plants used the 80MW Westinghouse 501B…

WE00100.jpg
The indoor Power at Combined Efficiency (PACE) 520 power plant located at the port of Dos Bocas, Mexico, which began operations in 1975. Comisión Federal de Electricidad (CFE) ordered several of Westinghouse Electric's PACE combined-cycle plants,…