Browse Items (14 total)

FSCH00397.jpg
An Apollo Command/Service Module (CSM) and Lunar Module (LM) assembly being hoisted for stacking on top of the Saturn V rocket in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) in Merritt Island, Florida. The CSM, along…

FSCH00297.jpg
The Apollo Command/Service Module (CSM) launching from Saturn IB for the Apollo-Soyuz Test Project (ASTP). On the final Apollo flight, a Saturn IB lifted the spacecraft aloft from Launch Complex 39B (LC-39B) at John F. Kennedy Space Center (KSC) in…

FSCH00290.jpg
The first Apollo-Saturn launch vehicle as it sat on Launch Pad 37B at Cape Canaveral Air Force Station (CCAFS) in Cape Canaveral, Florida, before its launch on May 28, 1964. Saturn I was the first heavy-lift dedicated space launcher used in the…

FSCH00289.jpg
A Saturn I launching from Launch Complex 37 of Cape Canaveral Air Force Station (CCAFS) in Cape Canaveral, Florida. Saturn I was the first heavy-lift dedicated space launcher used in the United States. The Saturn I rocket was designed to launch…

FSCH00285.jpg
The famous and ill-fated Apollo 13 spacecraft at Launch Complex 39A (LC-39A) of John F. Kennedy Space Center (KSC) in Merritt Island, Florida. The mission was crewed by Mission Commander Jim Lovell (1928-), Lunar Module Pilot Fred Haise (1933-), and…

FSCH00234.jpg
Technicians working under what is presumed to be a Command Module or a Service Module to prepare it for mating during Project Apollo at John F. Kennedy Space Center (KSC) in Merritt Island, Florida. The Apollo program was the third U.S. manned…

FSCH00230.jpg
An early mating of a test Apollo Command Module to the Service Module in Hangar AF in the Cape Canaveral Air Force Station (CCAFS) industrial area. The Apollo Command Module was the crew cabin for the Apollo Command/Service Module (CSM). The CSM,…

FSCH00229.jpg
An early mating of a test Apollo Command/Service Module (CSM) to a Launch Adapter in Hangar AF in the Cape Canaveral Air Force Station (CCAFS) industrial area. The CSM, along with the Lunar Module (LM), was a spacecraft used during Project Apollo to…

FSCH00224.jpg
An Apollo verification vehicle being moved from the Manned Spacecraft Operations Building (MSOB) (MSOB) at John F. Kennedy Space Center (KSC) industrial Area to Launch Pad 34 in Cape Canaveral Air Force Station (CCAFS). Verification vehicles are…

FSCH00234.jpg
Technicians working under what is presumed to be a Command Module or a Service Module to prepare it for mating during Project Apollo at John F. Kennedy Space Center (KSC) in Merritt Island, Florida. The Apollo program was the third U.S. manned…

FSCH00230.jpg
An early mating of a test Apollo Command Module to the Service Module in Hangar AF in the Cape Canaveral Air Force Station (CCAFS) industrial area. The Apollo Command Module was the crew cabin for the Apollo Command/Service Module (CSM). The CSM,…

FSCH00229.jpg
An early mating of a test Apollo Command/Service Module (CSM) to a Launch Adapter in Hangar AF in the Cape Canaveral Air Force Station (CCAFS) industrial area. The CSM, along with the Lunar Module (LM), was a spacecraft used during Project Apollo to…

FSCH00228.jpg
A chart showing the parts and steps involved with a assembly of Apollo Command/Service Module (CSM), Lunar Module (LM), and Spacecraft Launch Adapter (SLA). This visual guide indicates what should be done to make that part of the spacecraft launch…

FSCH00224.jpg
An Apollo verification vehicle being moved from the Manned Spacecraft Operations Building (MSOB) (MSOB) at John F. Kennedy Space Center (KSC) industrial Area to Launch Pad 34 in Cape Canaveral Air Force Station (CCAFS). Verification vehicles are…
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2